Case Studies

Hotel Saracen

Hotel Saracen

A 1.1 MWp rooftop and carport solar PV plant with energy storage for an energy-intensive hotel Cutting energy costs,…

Acqua Santa Maria

Acqua Santa Maria

Solar PV 1.5 MWp KEY FEATURES Construction and installation of a 1.5 MWp solar power plant under an E.P.C.…

Nino Castiglione

Nino Castiglione

Solar PV 1 MWp KEY FEATURES When installing the solar plant we had to take into account the considerable…

Gustibus Alimentari

Gustibus Alimentari

Solar PV 1 MWp KEY FEATURES General Contractor (E.P.C.) for the construction of a 1 MWp solar power plant…

Plastica Alfa (fittings division)

Plastica Alfa (fittings division)

Solar PV 800 kWp KEY FEATURES The solar plant was installed quickly on a domed roof. HANDLING Using a…

Hotel Torre Normanna

Hotel Torre Normanna

Solar PV 330 kWp KEY FEATURES The solar plant was installed using reinforced concrete ballast so that no roof…

Hotel La Playa

Hotel La Playa

Solar PV 140 kWp, solar thermal with 26 collectors KEY FEATURES Panels mounted on reinforced concrete ballast to avoid…

Ortogel

Ortogel

Solar PV 500 kWp KEY FEATURES The solar plant was installed on a very tight schedule so that the…

Sudgel

Sudgel

Solar PV 950 kWp KEY FEATURES We installed the solar plant on a tight schedule so that the client’s…

Soaplast

Soaplast

Solar PV 300 kWp KEY FEATURES A fully customised mounting system based on a preliminary study of the roofs,…

Sicilindustria

Sicilindustria

Solar PV 300 kWp KEY FEATURES We used a special mounting system that optimised space without drilling the beams,…

Saracen

Saracen

Solar PV 121 kWp, solar thermal with 36 collectors KEY FEATURES Specially designed reinforced concrete ballast was used, with…

Plastica Alfa

Plastica Alfa

Solar PV 800 kWp KEY FEATURES The solar plant was installed quickly on a factory with a “shed” (sawtooth)…

La Fonte

La Fonte

Solar PV 1 MWp KEY FEATURES Installation and wiring of the solar plant across several roof pitches on a…

Ferrara Quarzi

Ferrara Quarzi

Solar PV 150 kWp KEY FEATURES The solar plant was installed on a very tight schedule so that the…

Amazon

Amazon

Solar PV 99 kWp KEY FEATURES We used a special mounting system that allowed the solar panels to be…

Acqua Azzurra

Acqua Azzurra

PLANT CAPACITY: Two plants are currently in operation with a total capacity of 829 kWp, and by 2025 the…

Zicaffè

Zicaffè

Solar PV 171.12 kWp + 60 kWh storage KEY FEATURES Concept and design of a reinforced concrete slab as…

Tecnozinco

Tecnozinco

Solar PV 250 kWp KEY FEATURES We installed the solar plant on a very tight schedule because the client…

Nuova Commerciale

Nuova Commerciale

Solar PV 100 kWp KEY FEATURES Design and installation on insulated corrugated metal roofing. Particular care was taken with…

Hotel Saracen

A 1.1 MWp rooftop and carport solar PV plant with energy storage for an energy-intensive hotel Cutting energy costs, increasing independence from the grid…

  • Plant capacity

    1.1 MWp

  • Location

    Roof and solar carports

View Project
Acqua Santa Maria

Solar PV 1.5 MWp KEY FEATURES Construction and installation of a 1.5 MWp solar power plant under an E.P.C. contract HANDLING We paid particular…

  • Plant

    JA Solar PV modules - ZCS Azzurro inverters

  • Location

    Corrugated metal roof

View Project
Nino Castiglione

Solar PV 1 MWp KEY FEATURES When installing the solar plant we had to take into account the considerable distance between the PV array…

  • Completion time

    40 days

  • Location

    Corrugated metal roof

View Project
Gustibus Alimentari

Solar PV 1 MWp KEY FEATURES General Contractor (E.P.C.) for the construction of a 1 MWp solar power plant HANDLING Using a mobile crane…

  • Plant

    JA Solar PV modules - ZCS Azzurro inverters

  • Location

    Corrugated metal roof

View Project
Plastica Alfa (fittings division)

Solar PV 800 kWp KEY FEATURES The solar plant was installed quickly on a domed roof. HANDLING Using a mobile crane with a 24…

  • Completion time

    22 days

  • Location

    Shed (sawtooth) roof

View Project
Hotel Torre Normanna

Solar PV 330 kWp KEY FEATURES The solar plant was installed using reinforced concrete ballast so that no roof had to be drilled. HANDLING…

  • Completion time

    20 days

  • Location

    Rooftop with reinforced concrete ballast

View Project
Hotel La Playa

Solar PV 140 kWp, solar thermal with 26 collectors KEY FEATURES Panels mounted on reinforced concrete ballast to avoid drilling the roof, with rubber…

  • Completion time

    12 days

  • Location

    Flat roof

View Project
Ortogel

Solar PV 500 kWp KEY FEATURES The solar plant was installed on a very tight schedule so that the client’s normal operations could continue.…

  • Completion time

    5 days

  • Location

    Corrugated metal roof

View Project
Sudgel

Solar PV 950 kWp KEY FEATURES We installed the solar plant on a tight schedule so that the client’s normal operations could continue. HANDLING…

  • Completion time

    25 days

  • Location

    Corrugated metal roof

View Project
Soaplast

Solar PV 300 kWp KEY FEATURES A fully customised mounting system based on a preliminary study of the roofs, with certified pull-out and strength…

  • Completion time

    30 days

  • Location

    Roof

View Project
Sicilindustria

Solar PV 300 kWp KEY FEATURES We used a special mounting system that optimised space without drilling the beams, using a custom Omega profile…

  • Completion time

    38 days

  • Location

    Roof

View Project
Saracen

Solar PV 121 kWp, solar thermal with 36 collectors KEY FEATURES Specially designed reinforced concrete ballast was used, with no drilling of the roof.…

  • Completion time

    12 days

  • Location

    Flat roof

View Project
Plastica Alfa

Solar PV 800 kWp KEY FEATURES The solar plant was installed quickly on a factory with a “shed” (sawtooth) roof. HANDLING Using a mobile…

  • Completion time

    22 days

  • Location

    Shed (sawtooth) roof

View Project
La Fonte

Solar PV 1 MWp KEY FEATURES Installation and wiring of the solar plant across several roof pitches on a tight schedule, in scorching temperatures…

  • Completion time

    18 days

  • Location

    Pitched roof

View Project
Ferrara Quarzi

Solar PV 150 kWp KEY FEATURES The solar plant was installed on a very tight schedule so that the client’s normal operations could continue.…

  • Completion time

    5 days

  • Location

    Corrugated metal roof

View Project
Amazon

Solar PV 99 kWp KEY FEATURES We used a special mounting system that allowed the solar panels to be installed perfectly flush with the…

  • Completion time

    7 days

  • Location

    Domed roof

View Project
Acqua Azzurra

PLANT CAPACITY: Two plants are currently in operation with a total capacity of 829 kWp, and by 2025 the energy pipeline is expected to…

  • Completion time

    32 days

  • Location

    Concrete tanks

View Project
Zicaffè

Solar PV 171.12 kWp + 60 kWh storage KEY FEATURES Concept and design of a reinforced concrete slab as the installation surface for the…

  • Completion time

    15 days

  • Location

    Ground-mounted concrete base

View Project
Tecnozinco

Solar PV 250 kWp KEY FEATURES We installed the solar plant on a very tight schedule because the client needed to start up its…

  • Completion time

    10 days

  • Location

    Pitched roof

View Project
Nuova Commerciale

Solar PV 100 kWp KEY FEATURES Design and installation on insulated corrugated metal roofing. Particular care was taken with the installation, as the client…

  • Completion time

    5 days

  • Location

    Corrugated metal roof

View Project