A 1.1 MWp rooftop and carport solar PV plant with energy storage for an energy-intensive hotel Cutting energy costs, increasing independence from the grid…
Solar PV 1.5 MWp KEY FEATURES Construction and installation of a 1.5 MWp solar power plant under an E.P.C. contract HANDLING We paid particular…
Solar PV 1 MWp KEY FEATURES When installing the solar plant we had to take into account the considerable distance between the PV array…
Solar PV 1 MWp KEY FEATURES General Contractor (E.P.C.) for the construction of a 1 MWp solar power plant HANDLING Using a mobile crane…
Solar PV 800 kWp KEY FEATURES The solar plant was installed quickly on a domed roof. HANDLING Using a mobile crane with a 24…
Solar PV 330 kWp KEY FEATURES The solar plant was installed using reinforced concrete ballast so that no roof had to be drilled. HANDLING…
Solar PV 140 kWp, solar thermal with 26 collectors KEY FEATURES Panels mounted on reinforced concrete ballast to avoid drilling the roof, with rubber…
Solar PV 500 kWp KEY FEATURES The solar plant was installed on a very tight schedule so that the client’s normal operations could continue.…
Solar PV 950 kWp KEY FEATURES We installed the solar plant on a tight schedule so that the client’s normal operations could continue. HANDLING…
Solar PV 300 kWp KEY FEATURES A fully customised mounting system based on a preliminary study of the roofs, with certified pull-out and strength…
Solar PV 300 kWp KEY FEATURES We used a special mounting system that optimised space without drilling the beams, using a custom Omega profile…
Solar PV 121 kWp, solar thermal with 36 collectors KEY FEATURES Specially designed reinforced concrete ballast was used, with no drilling of the roof.…
Solar PV 800 kWp KEY FEATURES The solar plant was installed quickly on a factory with a “shed” (sawtooth) roof. HANDLING Using a mobile…
Solar PV 1 MWp KEY FEATURES Installation and wiring of the solar plant across several roof pitches on a tight schedule, in scorching temperatures…
Solar PV 150 kWp KEY FEATURES The solar plant was installed on a very tight schedule so that the client’s normal operations could continue.…
Solar PV 99 kWp KEY FEATURES We used a special mounting system that allowed the solar panels to be installed perfectly flush with the…
PLANT CAPACITY: Two plants are currently in operation with a total capacity of 829 kWp, and by 2025 the energy pipeline is expected to…
Solar PV 171.12 kWp + 60 kWh storage KEY FEATURES Concept and design of a reinforced concrete slab as the installation surface for the…
Solar PV 250 kWp KEY FEATURES We installed the solar plant on a very tight schedule because the client needed to start up its…
Solar PV 100 kWp KEY FEATURES Design and installation on insulated corrugated metal roofing. Particular care was taken with the installation, as the client…