Solar PV

Sicilindustria

Solar PV 300 kWp

KEY FEATURES
We used a special mounting system that optimised space without drilling the beams, using a custom Omega profile made to our own design. Thanks to this system, engineered in-house, we avoided drilling the client’s roof, as they had requested.

HANDLING
Using a mobile crane with a 36 m reach, we were able to position the panels quickly and in complete safety despite very limited working space.

CARBON FOOTPRINT
225 tonnes of CO2 saved every year.

  • Completion time

    38 days

  • Location

    Roof