Back
Hotel La Playa


Solar PV 140 kWp, solar thermal with 26 collectors
KEY FEATURES
Panels mounted on reinforced concrete ballast to avoid drilling the roof, with rubber mats placed between the roof surface and the ballast.
HANDLING
We used a 48-metre crane to lift materials onto the roof and rubber-wheeled trolleys to move the ballast across the roof without damaging its surface.
CARBON FOOTPRINT
105 tonnes of CO2 saved every year.
Next Project
Ortogel