Southern Head Office & Operations
Via A. Telesino, 51 - 90135 Palermo
info@mynoon.it
Ph: +39 091 6760886
North-East Operations Office
Via E. Gaspari, 78 - 33053 Latisana UD
Ph: ‎+39 0431 054549
Opening hours
Monday - Friday: 9:00 am - 6:00 pm
Saturday - Sunday: Closed
Back

Solar PV

Acqua Azzurra

Acqua Azzurra

PLANT CAPACITY: Two plants are currently in operation with a total capacity of 829 kWp, and by 2025 the…

Zicaffè

Zicaffè

Solar PV 171.12 kWp + 60 kWh storage KEY FEATURES Concept and design of a reinforced concrete slab as…

Tecnozinco

Tecnozinco

Solar PV 250 kWp KEY FEATURES We installed the solar plant on a very tight schedule because the client…

Nuova Commerciale

Nuova Commerciale

Solar PV 100 kWp KEY FEATURES Design and installation on insulated corrugated metal roofing. Particular care was taken with…

Nuova Sicilauto

Nuova Sicilauto

Solar PV 55 kWp KEY FEATURES We installed the solar plant on a very steep roof pitch, which required…

Acqua Azzurra

PLANT CAPACITY: Two plants are currently in operation with a total capacity of 829 kWp, and by 2025 the energy pipeline is expected to…

  • Completion time

    32 days

  • Location

    Concrete tanks

View Project
Zicaffè

Solar PV 171.12 kWp + 60 kWh storage KEY FEATURES Concept and design of a reinforced concrete slab as the installation surface for the…

  • Completion time

    15 days

  • Location

    Ground-mounted concrete base

View Project
Tecnozinco

Solar PV 250 kWp KEY FEATURES We installed the solar plant on a very tight schedule because the client needed to start up its…

  • Completion time

    10 days

  • Location

    Pitched roof

View Project
Nuova Commerciale

Solar PV 100 kWp KEY FEATURES Design and installation on insulated corrugated metal roofing. Particular care was taken with the installation, as the client…

  • Completion time

    5 days

  • Location

    Corrugated metal roof

View Project
Nuova Sicilauto

Solar PV 55 kWp KEY FEATURES We installed the solar plant on a very steep roof pitch, which required extra precision in both assembly…

  • Completion time

    8 days

  • Location

    Pitched roof

View Project